Bathroom installations & renovations in Kent
Complete bathrooms fitted start to finish: from strip-out and first-fix pipework to tiling, the suite and the finishing touches, all by one trusted team.

Overview
What bathroom fitting involves
A new bathroom touches plumbing, tiling and joinery, and it all goes a lot more smoothly when one person co-ordinates the lot. CTL handles full bathroom installations and renovations. We'll help plan the layout, strip out the old suite, run the first-fix pipework and fit everything back to a high standard.
Walk-in showers, baths, shower enclosures, basins, WCs, heated towel rails and designer radiators, supplied and fitted, or fitted to your own supply. Every bathroom photo in our gallery is a real CTL job.
Prefer to keep your existing layout? We also handle straight swaps and repairs: a new shower, a replacement basin or a leaking tap sorted without a full refit.
What's included
What our bathroom fitting covers
Bathroom installations
- Full bathroom refits
- Walk-in showers & wet rooms
- Baths & shower enclosures
- Basins, WCs & vanity units
- Heated towel rails & radiators
- Tiling & finishing
Repairs & upgrades
- Shower replacements
- Tap & mixer replacements
- Silicone & seal renewal
- Leaking or running toilets
Common questions
Bathroom fitting questions answered
- Do you supply the bathroom, or do I?
- Either works. We can supply and fit the whole suite, or fit fixtures and fittings you've bought yourself. Just let us know which when you enquire and we'll quote accordingly.
- How long does a bathroom installation take?
- Most full bathrooms take one to two weeks depending on the size, the amount of tiling and whether the layout is changing. We'll give you a realistic timescale with your quote.
Guides
Guides on bathroom fitting
Bathroom Fitters Canterbury
A bathroom in a Canterbury let is a different brief from a bathroom in a family home. What actually changes in the specification, where bathrooms really leak, and what earns its place.
Read more →How Long Does a Bathroom Installation Take
One to two weeks for most full bathrooms. What actually decides where you land in that range, why tiling and drying set the pace, and the one thing that adds days more often than the work does.
Read more →What Makes Plumbing in Faversham Different
Faversham's housing is older than most of Kent's, and it changes the job. What conservation status, solid walls and off-grid villages mean for a boiler, a bathroom or a leak.
Read more →
Before & after
The same room, before and after
One real CTL job, photographed from the same spot before we started and after we finished.

Before

After
Bath and dated suite to a walk-in shower room 
Before

After
Over-bath shower to a level-access walk-in shower 
Before

After
Pedestal basin to a fitted vanity unit
Our work
Recent jobs: Bathroom installations
Photographed on site, on real CTL jobs. No stock photography and no showroom shots.

Bathroom refit

Bathroom installation

Shower enclosure
Free estimates
Get your free estimate
Call, text or email: free home visits and free quotes across Kent.
